We stayed home this weekend while Tom gutted our upstairs bathroom. It’s taking a bit longer than I thought. We decided to get a new bathtub for our upstairs main bathroom since we’re doing everything else new. Well the bath we got was really hard to get into the actual room. It involved a lot of drywall coming out as well as the door frame. Anyways, the bath is in now and next weekend we can start with the tiling.
Meanwhile, Henry got loaded for St-Patty’s day (ok, so the beer was empty but that didn’t stop him from acting like a drunk).